TM 11-6625-2398-15-3
CHAPTER 1
INTRODUCTION
Section I. GENERAL
1-1. Scope
b. Report of packaging and Handling Deficiencies .
Fill out and forward DD Form 6 (Packaging Improvement
This manual describes Test Facilities Set AN/TPX-24(V)3
Report) as prescribed in AR 700-58/NAVSUPINST
(fig.1-1) and provides instructions for installation, use, and
4030.29/AFR 71-13/MCO P4030.29A, and DLAR 4145.8.
maintenance.
It includes instructions for cleaning,
c. Discrepancy in Shipment Report (DISREP) (SF
inspection, troubleshooting, testing, calibration, repair and
361). Fill out and forward Discrepancy in Shipment
replacement. It also lists tools, materials, and test
Report (DISREP) (SF 361) as prescribed in AR 55-
equipment required for maintenance.
A functional
38/NAVSUPINST 4610.33A/AFR 75-18/ MCO P4610.19B
analysis of the equipment is also covered.
and DLAR 5400.15.
1-2. Indexes of Publications
1-3.1. Destruction of Army Electronics Materiel
a. DA Pam 310-4. Refer to the latest issue of DA
Destruction of Army electronics materiel to prevent
Pam 310-4 to determine whether there are new editions,
enemy use shall be in accordance with TM 750-244-2.
changes or additional publications pertaining to the
equipment .
1-3.2.
Reporting Equipment Improvement
Recommendations (EIR)
b. DA Pam 310-7. Refer to DAA Pam 310-7 to
determine whether there are modification work orders
EIR' s will be prepared using SF 368, Quality Deficiency
(MWO' ) pertaining to the equipment.
s
Report. Instructions for preparing EIR's are provided in
TM 38-750, the Army Maintenance Management System.
1-3. Forms and Records
EIR's should be mailed directly to Commander, US Army
a. Reports of Maintenance level and Unsatisfactory
Command, ATTN: DRSEL-ME-MQ, Fort Monmouth. New
Equipment . Maintenance forms records and reports
Jersey 07703. A reply will be furnished directly to you.
which are to be used by maintenance personnel at all
maintenance level are listed in and prescribed by TM 38-
750.
Section II. DESCRIPTION AND DATA
Interrogator Set Group OX-8/TPX-50 when Signal
1-4. Purpose and Use
a. Test Facilities Set AN TPM -24(V) 3 is a portable
RT-903/TPX-50 are removed from Interrogator Set Group
set of special test accessories used to support the
Cabinet CY-6442 TPX -50. Two other AN/TPM -24 (V)3
maintenance of Interrogator Set AN TPX -50 If contains
cable assemblies Two other AN/TPM-24(V)3 cable
cable assemblies a hybrid attenuator, a front panel test
assemblies connect the OX-8/TPX-50 to external power
adapter and minor components (including connector
and triggering sources.
One AN/TPM-24(V)3 cable
adapters, dummy lads, extender boards and similar items)
assembly and minor components provide termination for
all housed in a transit case.
the rf sum and rf difference channels of Interrogator set
b. Five of the AN TPX -24(V) 3 cable assemblies
provide intraconnection between the major assemblies of
Change 2
1-1