TM 11-6625-2398-15-3
CHAPTER 8
GENERAL SUPPORT TESTING PROCEDURES
control settings and Equipment under test control
8-1. General
settings columns; then perform each specific test
a. Testing procedures are prepared for use by
procedure and verify it against its performance
Signal Field Maintenance Shops and Signal Service
standard.
Organizations
responsible
for
general
support
maintenance of signal equipment to determine the
8-2. Test Equipment and Material
acceptability of repaired equipment. These procedures
set forth ,specific requirements that repaired equipment
All test equipment required to perform the testing
must meet before it is returned to the using
procedures given in this chapter are listed in the
organization. These procedures may also be used as a
following charts and is authorized under TA-11-17,
guide for testing equipment that has been repaired if the
Signal Field Maintenance Shops, and TA-11-100(11-17),
proper tools and test equipments are available. A
Allowances of Signal Corps Expendable Supplies for
summary of the performance standards is given in
Signal Maintenance Shop, Continental United States.
a. Test Equipment.
b. Comply with the instructions -preceding each
chart before proceeding to the chart. Perform each step
in sequence. Do not vary the sequence. For each step,
perform all the actions required in the Test equipment
Nomenclature
Federal
Technical manual
stock no.
6625-553-7326
NAVSHIPS 9365
6625-957-4374
TM 11-6625-475-10
6625-246-5880
TM 11-2050
Standing Wave Ratio Indicator AN/
UPM-108A
6625-682-4494
TM 11-6625-335-12
Coaxial Slotted line IM-92/U
6625-356-0314
TM 11-5109
Low Paz Filter Hewlett-Packard
Co. Model 350C
5915-503-0533
_____
Crystal Detector Hewlett-Packard
Co. Model 423A
4940-871-8505
_____
Variable Attenuator, Alfred Elec-
tronics Model E101
_____
_____
Adapter (type N male to type BNC
female) UG-201A/U
5935-201-3090
_____
Adapter (type N female to typ
BNC female) UG-606/U
_____
_____
50 ohm Termination, Microlab/
FXR TA-6MN
_____
_____
Adapter (type BNC female to BNC
female) UG-914/U
_____
_____
Materials
Reference designation
Federal stock no.
b. Materials. The materials below required for the
general support testing procedures are supplied with the
Terminations
AT3/AT4
_____
test facilities set.
Cables
W14/W15
_____
Cable
A1W3
_____
Materials
Reference designation
Federal stock no.
Adapters
CP7/CP8
5935-201-3090
Fixed Attenuators
AT1/AT2
_____
8-1