TM 11-6625-2398-14-4
CHAPTER 2
INSTALLATION
during shipment. If the equipment has been damaged,
2-1.
Unpacking
b. See that the equipment is complete as listed on
a. Packaging Data. Components of Test Facilities
the packing slip. If a packing slip is not available, check
Set AN/TPM-24(V)4 are contained in the transit case
the equipment against the basic issue items list and
which is packed in a wooden packing case.
repair parts and special tools list (appendix C). Report
b. Unpacking.
all discrepancies in accordance with TM 38-750.
(1) Cut the metal straps and bend them away
Shortage of a minor assembly or parts that does not
from the packing case.
affect proper functioning of the equipment should not
(2) Use a nail puller or equivalent tool to
prevent use of the equipment.
remove the wooden cover.
c. If the equipment has been reconditioned, see
(3) Remove the transit case in its polyethylene
whether it has been changed by a modification work
wrap.
order (MWO). If the equipment has been modified, the
(4) Remove the polyethylene wrap.
MWO number will appear on the front panel near the
(5) Open the transit case by releasing the 16
nomenclature plate.
spring locks and inspect the humidity indicator; it should
be blue. If the humidity indicator is pink, inspect the
NOTE
contents for moisture damage.
Current MWO's applicable to the
2-2.
Checking Unpacked Equipment
equipment are listed in DA Pam 310-1.
a. Inspect the equipment for damage incurred
2-1