TM 11-6625-928-35
Section Ill. GENERAL SUPPORT TESTING PROCEDURES
not necessary to perform numbered test steps in
3-8. G e n e r a l
sequence; however, all test procedures must be
a. Testing procedures are prepared for use by
performed to certify the performance of the re-
maintenance shops and service organizations re-
paired equipment.
sponsible for general support maintenance to de-
termine the acceptability of repaired equipment.
3-9. Test Equipment, Tools, and Materials
These procedures set forth specific requirements
All test equipment, tools, materials, and other
that a repaired equipment must meet before it is
returned to the using organization. Testing pro-
equipment required to perform the testing pro-
cedures may also be used as a guide for the test-
cedures given in this section are listed in the fol-
ing of equipment that has been repaired at direct
lowing charts and are authorized under TAll-
support category maintenance if the proper tools
17, and TA-11-100 (11-17).
and test equipment are available. For each step,
NOTE
perform all the actions required in the Test
equipment and Equipment under test columns;
common name assignments.
then perform each specific test procedure and
verify it against its performance standard. It is
a. Test Equipment.
b. Materials.
3-10. Test Facilities
A dc power source of +27.5 volts 0.5 is re-
quired to furnish the operating voltages. To
deck the 115-volt, 400-Hz circuitry in the main-
tenance kit, an alternating current (aC) power
source of 115 volts 5, at 400 Hz, single phase
is required for testing, as described in the adf
3-11. Fabrication of Voltage Divider and
Special Test Probes
Testing of meters in the HOMING/ADF/GYRO
indicators requires the application of low level dc
voltages to pins on J1. The low level voltages
are derived by reducing the output voltage of the
+28-volt power
3-27