TM 11-6625-1696-12
CHAPTER 6
SHIPMENT, LIMITED STORAGE, AND DEMOLITION TO PREVENT ENEMY USE
Section I. SHIPMENT AND LIMITED STORAGE
6-2.
Repackaging for Shipment or Limited
6-1.
Disassembly of Equipment
Storage
Disassemble the test facilities set as follows:
a. Perform the stopping procedure (para 3-
Repackaging of equipment for shipment or limited
38).
storage normally will be performed at a packaging
b. Store all cables and accessories in their
facility or by a repackaging team. Should emergency
packaging be required, select the materials from those
assigned places in the accessory kit and in the lids of
listed in SB 38-100.
Package the equipment in
c. If the test facilities set is rack-mounted,
accordance with the original packaging, so far as
possible, with the available materials.
remove the units from the racks and mount them in their
cases.
d. Close the case lids and secure the latches.
Section II. DEMOLITION TO PREVENT ENEMY USE
6-3.
Authority for Demolition
rear panels, controls, switches, connectors, printed
circuit boards, and the meters.
Demolition of the equipment will be accomplished only
b. Cut. Cut the harnesses and power, RF,
upon order of the commander. Use the destruction
and interconnecting cables.
c. Burn. Burn cables and technical manuals.
use of the equipment.
d. Explode. Use firearms, grenades or
TNT, if
6-4.
Methods of Destruction
necessary.
e. Dispose. Bury or scatter the destroyed
Use any of the following methods to destroy the
parts or throw them into streams.
equipment:
a. Smash. Smash the cases, the front and
6-1